IBM i V1 C9010-030 certification exam as a profession has an incredible evolution over the last few years. DumpsCollections Provide you latest IBM i Administration V1 IBM C9010-030 exam questions similar to actual C9010-030 exam. So,Here are updated IBM C9010-030 exam questions, which will help you to test the quality features of DumpsCollections exam dumps material completely free. You can purchase the full product once you are satisfied with the product.

C9010-030 exam questions, C9010-030 PDF dumps; C9010-030 exam dumps:: https://www.dumpsschool.com/C9010-030-exam-dumps.html (66 Q&A) (New Questions Are 100% Available! Also Free Practice Test Software!)

Latest and Most Accurate IBM C9010-030 Dumps Exam Questions and Answers:

Version: 8.0
Question: 21

Two HMCs manage the same server. An administrator recently upgraded the HMC firmware from level V8 R8.2 0 to V8 R8.3.0 on one of the consoles. Shortly after, a connection error “Version Mismatch…” appeared on the second console.
Which process will resume the functionality for the second console?

A. Reboot the second HMC.
B. Upgrade the second HMC to V8 R8.3.0, re-initialize the server connection, and restore the partition profiles
C. Select Reset or Remove Connections on the second HMC to reset the connection
D. Install the latest service pack on the second HMC and re-initialize the server connection.

Answer: C

Question: 22

An installation has been running the production system with system value QSECURITY set to 30. Management has been advised by a security consultant to change the system value QSECURITY to 40.
What is the consequence of implementing this change?

A. All user profiles will have special authority *ALLOBJ removed.
B. A user ID and password will be required at sign-on.
C. Programs will be limited to using IBM defined methods for accessing operating system capabilities and information.
D. Library QTEMP becomes a permanent object that cannot be cleared as part of job end processing. The RCLSTG command will need to be run more often.

Answer: A

Question: 23

New Updated C9010-030 Exam Questions C9010-030 PDF dumps C9010-030 practice exam dumps: https://www.dumpsschool.com/C9010-030-exam-dumps.html

An upgrade from IBM i 6.1 to IBM i 7.2 is being planned. The system is currently configured to use an Operations Console Direct (Async) Connection.
What must be done prior to upgrading to ensure the console session will work?

A. Update IBM i Access for Windows console PC to version 7 2.
B. Enter SST Take Option 8. “Work with service tools user IDs and Devices*. Take Option 3 “Select console”. Press F6 to “Backup Operations Console Configuration”.
C. Migrate from Operations Console Direct (Async) to Operations Console LAN.
D. Ensure CTL01 is Active and all DSPO” display status is ‘Vary on Pending”.

Answer: A

Question: 24

Which report in the Security Tools menu is used to find user profiles whose password is the same as the user profile and to take an action against the profiles?

A. Change active profile list
B. Analyze profile activity
C. Analyze default passwords
D. Disable default password profiles

Answer: C

Question: 25

An auditor needs an administrator to show the differences between a file as it currently exists and as it existed in the past.
Which command can help the administrator determine the differences assuming that journaling for the file was active and the receivers for the timeframe in question exist?

A. CMPPFM
B. CMPJRNIMG
C. RCVJRNE
D. WRKJRNA

Answer: C

Question: 26

A CL program that runs after an IPL must complete and errors will be researched at a later time. How can all CPF massages be acknowledged so the program continues running?

A. Add a MONMSG(CPFOOOO) command immediately before the ENDPGM command.
B. Add a MONMSG(CPFOOOO) command after the ENDPGM command.
C. Add a MONMSG(CPFOOOO) command immediately after the PGM command.
D. Add a MONMSG(CPFOOOO) command before the PGM command.

Answer: C